July the best-selling honey processing line of equipment -- Guangzhou Lanyang Mechanical Equipment C

Issuing time:2020-07-21 17:13

Guangzhou Nanyang Enterprise - Guangzhou Lanyang Mechanical Equipment Co., LTD., Honey processing line of the best-selling equipment in July.

Honey production and processing process (Guangzhou Nanyang Enterprise - Guangzhou Lanyang Mechanical Equipment Co., LTD.) :

Melting honey pool: The temperature controller of melting honey pool is set at 55 ℃ or below 60 ℃. Press the hot button


Heat it up. When the temperature reaches the set temperature, some heating can be turned off, and only one can be kept


Gear heating switch heating. Do not start heating without water in the pool, so as to avoid dry heating of electric heating rod without water


Damage. Guangzhou Nanyang Enterprise - Guangzhou Lanyang Mechanical Equipment Co., LTD


left


Preheating cylinder preheating: 1. Add water or heat conduction oil from the inlet, and the amount added is capped by the outlet water outlet


Overfilled can be discharged by the bottom of the sewage outlet a little, usually can occasionally touch the surface temperature of the barrel


Determine if the water level is too low before adding water.


2. It can be heated in advance, and the temperature controller is set at about 55 ℃ and 60 ℃


Below, press the hot button to heat. When the temperature reaches the set temperature, several additions can be turned off


Heat, can keep only one gear heating switch heating.


3. Turn on the stirring button after feeding and wait for the pointer of the physical thermometer on the preheating cylinder to reach 55


About degrees Fahrenheit (depending on the material to determine the heating temperature) can be discharged.


4. Maintenance: the engine oil in the reducer should be refilled after using for about a year to avoid loss


Damage to speed machine.

Guangzhou Nanyang Enterprise - Guangzhou Lanyang Mechanical Equipment Co., LTD


left


Filter (coarse filter → fine filter) : check the position of seal ring and filter when cleaning/changing the filter screen


Is the net broken? The filter screen should be cleaned in time after production. In production


Can not be found in and out of the material, you can check whether the filter is blocked and row


Whether the air port is closed. Guangzhou Nanyang Enterprise - Guangzhou Lanyang Mechanical Equipment Co., LTD


left


1. Interlayer water: water or heat conduction oil is added from the inlet. The amount of water added is capped by the outlet water.


Add full can be discharged from the bottom sewage outlet a little, less water evaporation without special


Connect the water source, usually can occasionally touch the surface temperature of the bucket to judge the water level


Lower and then add water.


2. Vacuum pump connection inlet and outlet water: The inlet of vacuum pump connection water source must have certain water pressure and cold water


Temperature, in case the water pressure and temperature are not enough to achieve the condensation effect. two


The drainage outlet should be in charge of drainage, in order to avoid the vacuum pump drainage pressure is too cold


The condenser has no condensation effect. Be careful not to reverse.


3. Heat in advance: The temperature controller is set at about 55 ℃ and below 60 ℃. Press


Add hot key to heat. When the temperature reaches the set temperature, it can be turned off several times


Heating, can only keep a heating switch heating.


4. Feed: Close all the valves of the concentrator, open the water source and open the vacuum pump (do open the vacuum pump


Open water source to avoid damage of vacuum pump without water.) The vacuum degree of vacuum gauge is above 0.06.


After the preheating cylinder preheats the material, the feed valve can be opened. Feed quantity shall not exceed


Concentration pot view mirror position (depending on the material in the vacuum state foam height, bubble


Foam will be removed by vacuum pump when it exceeds the top of the mirror, causing material loss. Found in advance


If the hot cylinder does not discharge completely, the feeding valve can be closed temporarily until the material settles slightly


Open the feed valve. Open the exhaust valve to empty the negative pressure in the concentrator after feeding


Vacuum pump starting pressure.


5. Concentration: Close all the valves of the concentrator and then open the vacuum pump again to observe the material production bubble


Foam condition, if close to the middle of the mirror can open the exhaust valve a little, foam


It's going to go down gradually. If the material is less foam, the maximum is less than the view mirror


Open the exhaust valve. Observe the condensation effect on the surface of the condensing tube to avoid overheating of the water temperature


Condensation. Condense to little or no foam.


6. Sampling: Sampling shall be performed by the sampling port after enrichment. Record the material quantity and thickness


Pre - shrinkage, post - concentration, and concentration time to determine concentration time)


If achieve the desired effect of concentration and requirements can be discharged. If the requirements are not met,


The vacuum pump can be restarted for longer condensing time.


7. Discharging: Be sure to open the exhaust valve when discharging.


left


Finished storage tank: The materials in the tank should be filled in time to prevent the materials from being discharged after cooling and solidification. Guangzhou Nanyang Enterprise - Guangzhou Lanyang Mechanical Equipment Co., LTD


left



Semi-automatic irrigation and filling machine: Guangzhou Nanyang Machinery And Equipment Co., LTD


1. Air source: The air compressor should not be too small, in order to avoid insufficient air pressure filling quantity is inaccurate.


2. Adjust the filling quantity: loosen the screw, shake the handwheel to move back and forth to adjust the filling quantity.


Record the number on the position display (this number does not represent irrigation


The load).


3. Inlet and outlet speed: The material can pass through the throttle valve if it is splashed when the material is fed and discharged too fast


Adjust feed in and out speed.


4. Stop midway: check the air pressure. Press the reset button to restore the machine after the air pressure is normal


Bits can be used normally.


5. Maintenance: It shall be cleaned in time after use to avoid solidification and filling of materials.


Check sealing O-ring integrity frequently to avoid production process


Leakage occurs when the seal ring is damaged.


Share to:

What we seek is to create value for our

customers with a more considerate and

efficient service

Contact Us
Phone : +86 13602719077
Tel : 020-84286878
E-mail : sales@made-in-ly.com
Add :Liantang Industry Zone, Shiqi Town, Panyu District, Guangzhou City, China

facebookfacebook52.png Linkedin.png social-_round-instagram.png social-_round-youtube.png tuitetwitter43.png